Enter your email address to be notified when this item is back in stock








Out of Stock
Luxe out. Earthy, industrial-looking mango wood. This dining table was always going to be a looker. The metallic trend's nailed too, thanks to the solid brass cladding – Anderson's a knock-out furniture piece designed to add a luxe feel to your place. Solid wood. Designed in-house and made in India. Anderson boasts the solid mango wood and weighty frame you’d expect from a high-end piece, without the high price tag. MADE to match. Perfect for long dinners, Anderson’s show-stopping look is sure to drop jaws. Team yours with matching metallic accessories around the room and invest in the full collection for an elevated take on industrial style in your home.
This dining table offers a great blend of natural warmth and modern sophistication, making it versatile for various interiors. Its mango wood surface paired with brass details adds a contemporary yet inviting touch, ideal for both minimalist and eclectic spaces. I love how it balances practical durability with stylish appeal-perfect for hosting family dinners or casual gatherings. For styling, consider pairing it with upholstered or wooden chairs that complement the wood tone, and keep the tabletop clutter-free with elegant centrepieces or simple dinnerware. This table works well in both contemporary open-plan kitchens and more traditional dining rooms, providing a timeless piece that can evolve with your interior style over time.
Adrian Wells
Flitch Interior Stylist
Height:
76.0cmWidth:
180.0cmDepth:
90.0cm